Planning a Garage or Pole Barn Slab? 7 Things to Decide Before We Pour

Garage & Pole Barn Slabs

A garage or pole barn floor seems simple. It’s a flat slab of concrete, right? But a lot of the decisions that make a slab last 40 years, or crack in five, get made before the first truck shows up. And once it’s poured, most of them can’t be changed.

We pour a lot of shop, garage and pole barn floors across the lakes area. Here are the seven things I go over with every customer before we pour.

pole barn walker mn

1. What’s going to park on it?

This decides how thick the slab needs to be. A typical car garage floor is about 4 inches thick. If you’re parking a heavy pickup, a camper, a boat on a trailer, a skid steer or a tractor, we’ll talk about going thicker and adding more reinforcement. Tell me what you have now and what you might own in ten years.

2. Do you want in-floor heat?

If there’s any chance you’ll want a heated shop, decide now. In-floor heat means insulation board and PEX tubing laid out before the pour. Adding it later means tearing out the floor. Even if you’re not ready to buy a boiler, some folks put the tubing in anyway so the option is there.

3. Vapor barrier and insulation

For heated spaces, we typically put insulation and a vapor barrier under the slab. It keeps the heat in the floor and moisture out. For a cold storage building, it may not be needed. We’ll talk through what makes sense for how you’ll use it.

4. Drainage and slope

Snow melting off a truck has to go somewhere. Most garage floors are sloped slightly toward the overhead door so water runs out. If you want a floor drain or a trench drain, check with your county or township first, since rules on where that water can go vary. Either way, the slope and drains get set before the pour.

5. The base underneath

This is the part nobody sees and the part that matters most. We excavate, bring in the right base material and compact it in layers. Poor base is the number one reason I see slabs settle and crack. Because we do our own excavation and site prep, we control that from the ground up.

6. Reinforcement and control joints

Concrete is going to crack. Our job is to tell it where. We use rebar or wire mesh to hold the slab together and saw-cut control joints so any cracking happens in a straight line in the joint, not wandering across your floor.

7. Finish and extras

A smooth trowel finish is easy to sweep and great for a shop. A light broom finish gives more grip when it’s wet. Also think about:

  • An apron in front of the doors so the transition from the driveway is clean
  • Thickened edges or footings for walls and posts
  • Floor sealer to resist oil, salt and stains

When to pour

For a pole barn, we often pour the floor after the building is up. The roof keeps weather off, and with heat and blankets we can pour later into the season than you’d think. For a new garage or shop next year, now is the time to plan, get a quote and get on the spring schedule before it fills up.

Call me at (218) 851-6491 and I’ll come out, look at your site and walk through these with you. Free estimate, no pressure.

— Brian Shepard, Owner, A1 Northern Concrete & Excavation

Ready to Start Your Concrete Project?

Whether it’s a new foundation, a stamped patio or a full site build-out, A1 Northern Concrete & Excavation is ready to help. Call Brian today for a free, no-pressure quote and find out why homeowners across the Minnesota lakes area trust us with their concrete.